The Al Sila Tower of the Abu Dhabi Financial Centre (ADFC) on Al Maryah Island has been opened for use. So far, already 80 percent of the office space has been leased.
The other towers Al Sarab, Al Maqam and Al Katem have also been completed and will be put into operation shortly. In addition to the four commercial towers, the complex will house the Abu Dhabi Stock Exchange, two five-star hotels and a luxury shopping mall. In total, the centre will have room for over 12,500 employees.
XSPlatforms supplied ten building maintenance units for the ADFC project. Eight of those were fixed installations and two traversing. All façade access installations have been equipped with a telescopic jib with a maximum reach of 33.5m (109.9ft), glass replacement units with a maximum load of 600kg (1322.8lbs) and an adjustable gondola.